logo

Troy’s celebrated solar house left in dark

Home » architecture » Troy’s celebrated solar house left in dark

Troy’s celebrated solar house left in dark

| architecture, buildings, green buildings | May 15, 2009

solar1

Facility touted as next big thing still shut

Shawn D. Lewis / The Detroit News

Troy — It was supposed to be a shining example of the green movement — a completely independent solar-powered house with no gas or electrical hookups.

Seven months ago, officials gathered for a ribbon-cutting ceremony to celebrate the $900,000 house owned by the city of Troy that was to be used as an educational tool and meeting spot.

But it never opened to the public. And it remains closed.

Frozen pipes during the winter caused $16,000 in damage to floors, and city officials aren’t sure when the house at the Troy Community Center will open.

“It’s not safe right now, and there’s no estimated opening time because it depends on when we can get funding,” said Carol Anderson, director of the city’s Parks and Recreation Department.

That surprised the Oakland County Planning and Economic Development Department, which advertised tours of the house for its Tuesday Oakland County Green Summit.

“No, I didn’t know anything about it,” said Steve Huber, spokesman for county planning.

Bret Rasegnan, planning supervisor for the department, said the solar tours have been removed from the finalized agenda for the summit.

“It is disappointing that we can’t tour, but the summit will still be of great value. I don’t think it’s reflective of the technology.”

Lawrence Technological University, with help from DTE, mostly paid for the building. Its students built the 800-square-foot home, which was supposed to be livable year-round, free from the grid and churn out enough solar power to support a home-based business and electric vehicle.

So what caused the flood?

The city says it was a mechanical problem. University officials heard it differently.

Jeff Biegler, superintendent of parks for the city, said the flooding occurred from a glitch in the heater.

“The system was designed to kick a heater on to keep water from freezing,” Biegler said.

“The heater drew all reserve power out of the battery causing the system to back down and the pipes froze.”

Joe Veryser, an associate dean of architecture at the university, said he heard otherwise.

“What I heard repeatedly was that somebody turned off the breaker during the winter and forgot to turn it back on, which caused the pipes to freeze and then break.”

About the author

Drawing upon original ideas and extensive personal and professional experience in the field, David McFadden crafted this article to explore the latest trends in the fields of architecture and building design. After working at various design practices—both full-time and freelance—and launching his design firm, David identified a significant gap in the industry. In 1984, he founded Consulting For Architects Inc. Careers, an expansive hub designed to align architects with hiring firms for mutual benefit. This platform enables architects to find impactful design work and frees hiring firms from the time-consuming cycles of recruitment and layoffs. David’s innovative approach to employer-employee relations has brought much-needed flexibility and adaptation to the industry. As the Founder and CEO, David has successfully guided his clients and staff through the challenges of four recessions—the early ’80s, early ’90s, early 2000s, the Great Recession, the pandemic, and the current slowdown due to inflation and high-interest rates.

One Response to "Troy’s celebrated solar house left in dark"
  • Jinosnots May 20, 2009

    Wonderful web site: Will definitely visit again.

New Jobs